Tag: K2 at K Station

1 2 20 / 27 POSTS
An itinerant YoChicago evening

An itinerant YoChicago evening

If you've been following YoChicago, you know that our days aren't spent in the office. Yesterday evening's schedule called for four sponsored vide [...]
A smile and an umbrella at K2 Apartments

A smile and an umbrella at K2 Apartments

The lyrics of an old song tell you to "let a smile be your umbrella." "Let a smile be your umbrella, and you'll end up with a face full of rai [...]
Meet Cuvée, Paramount Room and new residents at K2 Apartments

Meet Cuvée, Paramount Room and new residents at K2 Apartments

A rainy day relocated K2's open house from the outdoor pool to an indoor party room, but it didn't dampen the turnout or the upbeat mood of the pe [...]
A photo tour of K2’s amenities

A photo tour of K2’s amenities

K2, the newly-opened apartment tower at 365 N Halsted in the Fulton River District, is one of our sponsors. The management and leasing staff were [...]
Fifield delivers K2 apartments ahead of schedule

Fifield delivers K2 apartments ahead of schedule

The first apartment move-ins at K2 in the Fulton River District are slated for March 1, well ahead of schedule. I'll be there this morning, visiti [...]
What Yo’s YouTube visitors have been watching

What Yo’s YouTube visitors have been watching

If you asked me to guess the three most-watched YoChicago videos during the last 30 days, I'd have guessed wrong on all of them. YouTube Analy [...]
A rooftop view from K2 at K Station

A rooftop view from K2 at K Station

A week rarely goes by without my visiting at least one Chicago rooftop. Yesterday I rode the construction elevator to the top of K2 at K Stati [...]
Ken Derry rides the crane down at K2

Ken Derry rides the crane down at K2

The views from K2 at K Station are great, but they don't compare with the views from high above the Trump Tower. Ken Derry operated one of the [...]
Crane coming down, paint going on at K2 at K Station

Crane coming down, paint going on at K2 at K Station

The dismantling of the tower crane is one of the major milestones in the construction of a high-rise building. It's a sign that the heavy-lifting is o [...]
The topping-off party at K2 at K Station apartments

The topping-off party at K2 at K Station apartments

Almost a year to the day after breaking ground on K2 at K Station, Fifield Companies hosted a topping-off party to celebrate the building's reachi [...]
An aerial progress report on K2 at K Station

An aerial progress report on K2 at K Station

If you time travel back 10 years the Fulton River District was a largely barren area, and it would have been hard to envision how swiftly it has d [...]
K2 at K Station nearing its full height

K2 at K Station nearing its full height

K2 at K Station has added six floors in the three weeks since my last visit. The 34-story, 496-unit apartment tower in the Fulton River Distric [...]
K2 construction update – a crane jump, paint and the heat

K2 construction update – a crane jump, paint and the heat

Late last week four 20-foot sections were added to the tower crane at K2 at K Station, bringing it to its final height and enabling construction t [...]
At K2, what so proudly they hailed

At K2, what so proudly they hailed

You'll find an American flag unfurled somewhere at nearly every major construction site. The Star Spangled Banner at K2 at K Station "in full [...]
A video tour of the K2 construction site

A video tour of the K2 construction site

K2 at K Station is a 496-unit 34-story apartment tower that's under construction in Chicago's Fulton River District. McHugh Construction Projec [...]
On the construction site at K2 at K Station

On the construction site at K2 at K Station

When I visited K2 at K Station earlier today approximately 150 workers from various trades were busy assembling plumbing fittings, installing elec [...]
A K2 at K Station construction update

A K2 at K Station construction update

My recent schedule has kept me from spending as much time as I would have liked to at K2 at K Station, which is under construction in the Fulton R [...]
A time-lapse video of K2 from day one to now

A time-lapse video of K2 from day one to now

K2 at K Station, a 34-story, 496-unit high-rise apartment building in the Fulton River District broke ground last October. Its progress from then [...]
K2 at K Station Apartments, a construction update

K2 at K Station Apartments, a construction update

Alan Schachtman is a principal in the Fifield-Wood joint venture that's developing K2 at K Station, a 34-story, 496-unit high-rise apartment build [...]
K2 construction, Marie’s view from the tower crane

K2 construction, Marie’s view from the tower crane

Marie Spear and Greg Hayes, the team operating the tower crane at K2 at K Station, are veteran members of Operating Engineers Local 150. They spen [...]
1 2 20 / 27 POSTS